- Butler rail extension stage 1 and 2 bulk earthworks
- Hester ave to North butler train station
- Extensive batter work rock batters/blended mulch topsoil batters with grid erosion stamping and safety berms
- Extensive vertical rock breaking for future bridge 700m long 25m wide 7m deep Perths largest verticle breaking project
- Extensive v drains
- Detailed bridge excavations with vertical breaking and intricate footings
- Fill area rehabilitation
- Bulk loading
Completion 21/7/2009 stage 1
Completion 30/7/2012 stage 2
Client RJ Vincent